HomeNewsCherry Hill NewsGas main repairs to start tonight at intersection of Route 70 and...

Gas main repairs to start tonight at intersection of Route 70 and Covered Bridge Road

No through traffic will be permitted at the intersection beginning Monday night at 9 p.m. for the duration of the project.

Emergency gas main repairs will necessitate a traffic detour on Route 70 at Covered Bridge Road for the next three weeks.

- Advertisement -

Beginning tonight and lasting approximately three weeks, PSE&G will be making emergency gas main repairs at the intersection of Route 70 and Covered Bridge Road/Frontage Road in Cherry Hill. Work will begin tonight at 9 p.m. and continues 24 hours a day.

Because of the construction, the intersection will be closed to through traffic. Left turns will not be permitted onto Route 70 in either direction. Motorists will still be able to turn right onto the highway.

The construction should not affect traffic flow on Route 70. Two lanes of traffic will remain open in each direction at all times. Motorists are asked to use caution when traveling through the area.

RELATED ARTICLES

Related articles

11

15

Harvest festival on tap
September 27, 2024

17

Calendar
September 27, 2024

18

New Friday night lights
September 26, 2024

19

National Public Lands Day
September 26, 2024

22

Cherry Hill Calendar
September 20, 2024

28

‘Not a normal call’
September 13, 2024

33

‘I know that song!’
September 6, 2024

35

Making music
September 6, 2024

37

War on Terror Medal event
September 6, 2024

current issue

latest news

Newsletter

How to reach us